Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowCanadian economy lost 68,000 jobs in September, marking second straight month of surprise declines· CBCBusiness groups warn of irreversible economic consequences if trade deal remains in limbo· Financial PostWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaGlobal trade is changing how the Canadian economy works· Bank of CanadaHoles In Value Chains Are Holding Back Five Sectors That Have The Potential To Reshape Canada’s Economy For The Better· Canadian Chamber of CommerceEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsRegina business leaders to hear outlook on Canada's economy· SaskToday.caTiff Macklem on tariffs, inflation and Canada’s economic crossroads· PNI Atlantic NewsFive bold swings to advance the Canadian economy· Be GiantCanadian Business Leadership Takes Centre Stage in Calgary· Canadian Chamber of CommerceDeloitte expects slowing pace of economic activity in Canada into 2027· Financial PostWhat would being an 'associate member' of the EU mean for the Canadian economy and businesses?· Financial PostHalf of small business owners don't advise starting a business in current economy, survey says· Financial PostPrime Minister Carney introduces new Productivity Mega Deduction to boost Canada’s advantage as the most competitive G7 country for new business investment· Prime Minister of Canada
← All tenders
Environment and Climate Change Canada

Système d'Argon en Vrac

Other
Estimated value
Not disclosed
Deadline
November 22, 2023
Published
November 6, 2023
Type
Construction
Explore similarStructures and Building and Construction and Manufacturing Components and Supplies

Full description

Title:
Bulk Argon System

Location:
Canada Centre for Inland Waters (CCIW)
867 Lakeshore Rd.
Burlington, ON, L7S 1A1

Two Phase Selection Process:
This is the first phase (Phase One) of a two-phase competition. The first phase will evaluate the qualifications of all bidders. The second phase, (Phase Two), will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of a contract in Phase Two, the pre-qualification list resulting from the first phase will expire and will not be used in any other solicitation.

Work Description:
The Contractor shall provide all necessary labor, materials, equipment, project management, and contract administration work required to complete the below scope of work:

1. Contractor shall provide all labour, materials and equipment necessary for the proper and timely completion of the mechanical systems required to have Argon gas to be transported from the main tank near the warehouse to the 4th and 7th floor of the main building. (Around 800 m of Argon piping infrastructure to be installed)

2. All materials and equipment and the furnishing of all labour shall be included to provide systems ready for satisfactory operation of laboratories equipment that uses Argon gas.

3. Furnish all required labour and materials, machinery, scaffolding tools, implements, or other appliances together with all proper and required facilities for moving and transporting same, so that the Contract and all Work to be done under it, can and will be carried on in a workmanlike manner, properly, satisfactorily, continuously, and expeditiously, to completion, in all respects to the satisfaction of the Owner.

4. Mechanical Contractor to be aware that any Work required to be performed in the building is to be carefully and closely coordinated. The areas to be affected by the new piping Work and demolition Work shall be identified prior to commencing construction as soon as possible after award of Contract. The drawings show piping in a general arrangement. The actual pipe and duct layout is to be determined prior to fabrication only after close examination of obstructions such as structural systems, ceiling systems, light fixtures, fan coil units, piping, and ductwork.

Site Visit:
There will be a mandatory site visit during the second phase of the tender.

Estimated Value:
To assist with bonding and insurance requirements, this project is estimated to cost approximately between $400,000.00 and $500,000.00 (taxes excluded).

Documents may be submitted in either official language of Canada.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
cb-688-36163135
Solicitation no.
5000066708RR
Buyer
Environment and Climate Change Canada
Notice type
Invitation to Qualify
Method
Competitive - Open bidding
Procurement category
*CNST
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

UNSPSC
UNSPSC 30000000 — Structures and Building and Construction and Manufacturing Components and Supplies

Delivery & regions

Regions of delivery
*Ontario (except NCR)
Contract term
January 2, 2024 → March 31, 2024

Key dates

Published
November 6, 2023
Closes
November 22, 2023
Amendment no.
007

Live tenders

Department of Canadian Heritage (PCH)1 day left

Building of the Snowflake Kingdom

Construction
76 MATCHView →
Infrastructure1 day left

Infrastructure - Invitation to Bid - Plan No.: 024102A WETASKIWIN - PROVINCIAL BUILDING - Security Camera Upgrade and New Cameras and Card Reader Install

81 MATCHView →
Public Safety and Emergency Services1 day left

Public Safety and Emergency Services - Request for Quotes - CSD Substance Recovery Toilet

75 MATCHView →