Trade Agreement: NONE
Tendering Procedures:
Attachment: None
Competitive Procurement Strategy: Best Overall Proposal
Comprehensive Land Claim Agreement: No
Nature of Requirements:
(a) Title :
Geo-referenced navigation and tracking system for an airborne
imaging spectrometer
(b) Objective:
The objective of this project is to provide the Airborne
Infrared Imaging Spectrometer (AIRIS) with the Line of Sight
(LOS) jitter stability and a Geo-steering stability suitable for
the measurement of static ground targets from an airborne moving
platform, and to improve the reliability of its LOS steering
system.
(c) Work location :
Work requiring access to the AIRIS instrument will be conducted
at DRDC Valcartier, except if the contractor and the technical
authority agree that it is more practical and cost effective to
set-up AIRIS at the contractor's facilities to conduct part of
the work. If AIRIS has to be transported to contractor's
location for part of the work, transportation and set-up of
AIRIS at contractor's location will be done by DRDC personnel.
Other parts of the work not requiring access to the AIRIS
instrument (such as log files data analysis) will be conducted
at the contractor's facilities.
(d) Ownership of Intellectual Property
Canada has determined that any intellectual property rights
arising from the performance of the Work under the resulting
contract will belong to Canada.
(e) Canadian Content
This procurement is conditionally limited to Canadian goods and
Canadian services.
(f) Security requirement
There is no security requirement associated with this
procurement.
(g) Maximum funding
The maximum funding available for the contract resulting from
the bid solicitation is $75,000.00 CAD (Goods and Services Tax
or the Harmonized Sales Tax extra, as appropriate. This
disclosure does not commit Canada to pay the maximum funding
available.
(h) Basis of Selection - Highest Rated Within Budget
To be declared responsive, a bid must:
(a) comply with all the requirements of the bid solicitation;
(b) obtain the required minimum points overall for the technical
evaluation criteria which are subject to point rating.
Bids not meeting (a) or (b) will be declared non responsive.
The responsive bid with the highest number of points will be
recommended for award of a contract, provided that the total
evaluated price does not exceed the budget available for this
requirement. In the event that the highest number of points is
obtained by more than one responsive bid, the responsive bid
with the lowest evaluated price will be recommended for award of
a contract.
In the event that there are more than one responsive bid with
the highest number of points and the lowest evaluated price, the
tie breaker will be the best score for the point rated
technical criteria of section 2 "Experience of the bidder". If
there is still a tie, the tie breaker will be the best score for
the point rated technical criteria of section 3 "Experience of
the Prime resources".
(i) Point Rated Technical Criteria
Group of point rated technical criteria Scores
Max Min
1. Technical proposal 35 NA
2. Experience of the bidder 40 NA
3. Experience of the Prime resources 20 NA
Total: 95 50
(j) Period of Contract
The period of the Contract begins on the date of Contract and
ends 6 months later.
This PWGSC office provide procurement services in French and
English. / Ce bureau de TPSGC fournit des services d'achat au
public dans les deux langues officielles.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.