Tender available date: Monday, October 5, 2026.
Tender closing date: Thursday, November 5, 2026.
Project Inquiries: Bijhan Chaglani, Manager, Construction Services, Procurement, Alberta Transportation and Economic Corridors. E-mail: B••••••••@•••.••.ca.
TENDERS will only be received by email at t••••••••@•••.••.ca, before 2:01:00 P.M., for construction of the following work:
TND0023917
Bridge Replacement and Other Work
547:04 BF 77284 - carrying Hwy 547 over WID Irrigation Canal, near Arrowwood
SOUTHERN REGION
APPROXIMATE QUANTITIES:
1 Lump Sum Traffic Accommodation for Bridge Construction
1 Lump Sum Demolition and Disposal of Bridge Structure
32 Pile Pile Set-up (Driven Piles) (HP310x94)
315 Metre Supply of Piling - Plain Steel H-Pile (HP310x94)
1 Lump Sum Construction of Abutments
1 Lump Sum Construction of Piers
1 Lump Sum Precast Concrete Units - Supply and Fabrication, Delivery and Erection (10.0 m SLW-510 - Interior)
175 Cubic Metre Heavy Rock Riprap (Class 1)
420 Tonne Asphalt Concrete Pavement - Mix Type M1 (PG 52-34)
1 Lump Sum Roadway Work - Hwy 547
1 Lump Sum Roadway Work - Access Roads and Twp Rd 220A
Contractor to supply all materials.
Contract Completion Date: June 15, 2027