This RFP is only available to the following short-listed Proponents: The List of Prequalified Consultants to be invited to participate in this RFP is taken from 2026-05.
.1 GeoMetrix Group Engineering Ltd.
.2 Parsons Inc.
.3 Stantec Consulting Ltd.
Any submission received from others will be returned without review.
Alberta Transportation and Economic Corridors requests the submission of proposals for:
BF75539-1 Major Bridge Design
Carrying HWY 58:08, Over Ponton River
Construction WAC0095413
BF73442-1 Major Bridge Design
Carrying HWY 35:14, Over MELITO CREEK,
Construction WAC0095418
BF73426-1 Major Bridge Design
Carrying HWY 35:10, Over Kemp River
Construction WAC0095423
BF76669-1 Major Bridge Design
Carrying HWY 40:34, Over Railway CNR
Construction WAC0095428
Preliminary Engineering, Detailed Design, Contract Tendering, Construction Supervision / Contract Administration, Post Construction and Warranty Inspection.
THE PROPOSAL MUST BE SUBMITTED IN TWO SEPARATE FILES; PART ONE (TECHNICAL QUALIFICATIONS) AND PART TWO (PROPOSAL FEE) (PDF DOCUMENTS EACH LESS THAN 10MB IN SIZE.
This is a Request for Proposal and not an Invitation to Tender. Alberta Transportation and Economic Corridors reserves the right to:
a) Request clarification from the Contractor on a proposal at any time during the evaluation process.
b) Accept a proposal without negotiation.
c) Reject a proposal without negotiation.
d) Negotiate changes in the Technical or Financial content of the successful proposal.