The Work takes place on Sable Island and generally consists of the replacement of the existing water treatment components of the water supply system that provides water to the Main Station located on the island.
The Work also includes the replacement of various electrical components, along with wiring to existing treatment system components. A floor drain in the building discharges directly underneath the building, near to the well itself; this drain is to be sealed, and the new system will drain to a new exfiltration trench to be constructed outside and away from the pumphouse. The well and water treatment equipment are located inside a concrete block building with slab on grade floor. A new connection to the treated water pipe outside the building will be made.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro