Trade Agreement: NAFTA / CFTA / FTAs with Peru / Colombia / Panama / Korea
Tendering Procedures: All interested suppliers may submit a bid
Competitive Procurement Strategy: Lowest/Lower Bid
Comprehensive Land Claim Agreement: No
Nature of Requirements:
Articulated Measuring Arm System
W3474-180331/A
Abela, Aaron
Telephone No. - (905) 615-2061 ( )
e-mail: a••••••••@••••••••.••.ca
NPP Amendment No. 001 is raised to extend the closing date of Request for Proposal to June 8, 2018.
REQUIREMENT: Department of National Defence (DND) - Aerospace and Telecommunication Engineering Support Squadron (ATESS) based out of 8 Wing Trenton requires one (1) complete Articulated Measuring Arm System. ATESS has a wide variety of manufacturing capability and capacity to the Canadian Armed Forces (CAF) particularly aircraft parts. The Measuring Arm System will be used to manufacture various types of rigid lines in support of multiple Royal Canadian Air Force (RCAF) fleets.
1. SECURITY REQUIREMENT FOR CONTRACTORS
Mandatory Security Requirement:
This procurement contains a mandatory security requirement as follows:
1. The Contractor/Offeror must, at all times during the performance of the Contract/Standing Offer, hold a valid Designated Organization Screening (DOS), issued by the Canadian Industrial Security Directorate (CISD), Public Works and Government Services Canada (PWGSC).
2. The Contractor personnel requiring access to sensitive work site(s) must EACH hold a valid RELIABILITY STATUS, granted or approved by CISD/PWGSC.
3. The Contractor/Offeror personnel requiring access to NATO UNCLASSIFIED information or assets do not require to hold a personnel security clearance; however, the Contractor must ensure that the NATO Unclassified information is not released to third parties and that the "needto know" principle is applied to personnel accessing this information.
4. Subcontracts which contain security requirements are NOT to be awarded without the prior written permission of CISD/PWGSC.
5. The Contractor must comply with the provisions of the:
a. Security Requirements Checklist attached at Appendix "C"
2. The requirement is subject to the provisions of the Canadian Free Trade Agreement (CFTA) and North American Free Trade Agreement (NAFTA).
3. Supply, delivery and installation must be completed on or before October 31, 2018.
See herein for further details.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.