Cardston County is proposing to repair two roadways within the County, 3.3 km of Township Road 40, which is located South of the Village of Hill Spring, as shown on Appendix A. And 2.0 km on Range Road 253 located South of the Town of Cardston as shown on Appendix B. It is proposed that Cardston County will be doing the Construction for this project. Therefore, no tendering or contract documents need to be prepared. Cardston County will also take responsibility for compliance with the necessary environmental regulations; therefore, no environmental preparation is needed from the consultant. The final delivery for the design of the two roadways is due on February 17, 2027.
- Design and Construction survey.
- Road design and Drawings.
- Cut and Fill volumes and diagrams.
- Preparation of crossing plans for all utility crossings and obtaining necessary approvals.
RFP Closing Date: September 10, 2026 @ 2:00pm
Anticipated Award Date: September 14, 2026
Design Final Due: February 17, 2027