Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowCanada's economy has found its footing. But is it enough to survive the U.S. trade war?· CBCBryan Yu: B.C. economy braces for tariff hit as small-business optimism falters· Business in VancouverLook West: Jobs and Prosperity for a Stronger BC and Canada - Province of British Columbia· Government of British ColumbiaProposed Tariffs Stack onto the Ongoing Investment Freeze· Canadian Chamber of CommerceGas prices drove inflation up to 3% in July as food cost pressures eased· The Globe and MailBUSINESS BEAT – More positive news for Canada’s economy· ArmchairMayor.caAlberta’s current, former premiers offer contradicting views on U.S. counter-tariffs· CTV NewsGovernment of Canada invests $5.6 million to support Black entrepreneurs in Alberta· canada.caCyclical rebound in Canada and structural strength in the U.S.· rbc.comCanada’s economy expected to rebound by year’s end: Deloitte· BNN BloombergBusiness News: Canadian economy grows 0.3% in May· Global NewsAmid trade upheaval, Canada’s most sustainable firms are building a more resilient economy· Corporate KnightsTechnical recession, falling financial confidence hurting businesses, workers: survey· Canadian HR ReporterThe false promise of sovereignty economics· The Hub | More Signal. Less Noise.
← All tenders
City of Calgary

City of Calgary - Request for Proposal - RFP 26-1664 Architect or Landscape Architect as Prime Consultant for Kingsland Park

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
September 16, 2026
Published
August 19, 2026
Type
Request for Proposal (RFP)
Explore similarBuilding and Facility Construction and Maintenance ServicesAlberta

Full description

The City of Calgary (The City) requires a qualified architect or landscape architect team to act as the prime consultant to advance the concept plan for Kingsland Park through all future design and construction phases. The team will be responsible for coordinating all required subconsultants and disciplines throughout design, procurement, regulatory approvals, construction, and post-construction phases. The team will be responsible for assigning a Coordinating Responsible Professional (CRP) for the building component of this project.

Kingsland Park is a 7.5 acre conversion of a former school to a large neighbourhood park. The park is located in the heart of Kingsland surrounded by multifamily and single-family residential developments with road frontage on the west and south. There is an existing parking lot, soccer field and established trees on site which were spared from the recent demolition of the school building and removal of two playgrounds. Approximately 50 bricks were salvaged from the school demolition and available to be incorporated into the new park design. The gentle grading and minimal encumbrance to the site avails itself to a breadth of park and recreation amenities.

Completed Concept Plan/Master Plan
In 2024, the City built a temporary “pop-up” park in Kingsland Park, creating new spaces to play, socialize, relax, and gather in the community. In-person and online feedback was gathered during this period and formed the 2024 and 2026 What We Heard Reports. Of the two concept plans presented to the public for feedback, one landscape concept was selected as the preferred option to be carried forward into the next design phase, as outlined in the Kingsland Park Masterplan Report. This Masterplan report is intended to guide the subsequent planning, design, procurement, construction and post construction phases that form the scope of this RFP.

It is expected that the team will validate, refine and implement the designs and concepts from the Kingsland Park Masterplan Report.

The proposed amenities include but are not limited to:

  • Artificial turf with bleachers and lighting
  • Full parking lot replacement
  • Basic washroom facilities and shelter
  • Accessible playground
  • Accessible pathway connections
  • Hardscape zones (four seasons)
  • Site furnishing
  • Increased tree canopy
  • Shrub planting
  • On-site stormwater management

The Kingsland Park project anticipates the following phases:

  • Phase 1 – Pre-design;
  • Phase 2 - Schematic Design (SD);
  • Phase 3 - Design Development (DD);
  • Phase 4 - Contract Documentation (CD);
  • Phase 5 - Procurement Services Assistance;
  • Phase 6 - Construction Administration (CA) Services; and
  • Phase 7 - Post Construction Services.

To be considered for this project, the Consultant must be registered with the Alberta Association of Architects or Alberta Association of Landscape Architects prior to award.

Unless otherwise stated in the Agreement Letter, the award under this RFP will be for all Phases of the Requirements, subject to approval by The City after each Phase.

AI Summary

The City of Calgary (The City) requires a qualified architect or landscape architect team to act as the prime consultant to advance the concept plan for Kingsland Park through all...

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
26-1664
Buyer
City of Calgary
Method
RFP
Estimated value
Not disclosed
Source
alberta

Classification & terms

UNSPSC
UNSPSC 72000000 — Building and Facility Construction and Maintenance Services

Delivery & regions

Province
Alberta

Key dates

Published
August 19, 2026
Closes
September 16, 2026

Live tenders

Centre de services scolaire des Grandes SeigneuriesClosing today

Travaux en électricité à exécution sur demande

Works
60 MATCHView →
Ville de Saint-Jérôme.Closing today

Service de déneigement de stationnements municipaux

Services
75 MATCHView →
Ville de DelsonClosing today

Déneigement des rues saison 2026-2027

Services
81 MATCHView →