Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowOpinion: Mark Carney’s climate ambitions still threaten Canada’s economy· Financial PostQ3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCA new chapter in Canada-India economic relations· Business Council of CanadaStaying in Canada is a 'huge relief' for Alberta business leaders· CBCTrump administration cancels some Canada tariffs amid close midterm races· NBC NewsWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCarney, Erdogan launch ‘strong and resilient’ Canada-Turkiye partnership· Al JazeeraJapan-Canada Chambers Council Joint Statement· Canadian Chamber of CommerceGlobal trade is changing how the Canadian economy works· Bank of CanadaEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsSoft economy should limit Bank of Canada's rate hikes: Capital Economics· BNN BloombergCanada’s services PMI shows sector shrinking for fourth straight month in September· The Globe and MailCanada’s inflation data, business survey on tap ahead of BoC decision· RBCPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial Post
← All tenders
Public Works and Government Services Canada

Compresseurs de plongée portatifs

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
April 12, 2022
Published
February 28, 2022
Type
Goods
Explore similarQuebec

Full description

Trade Agreement: CETA/WTO-AGP/CPTPP/CFTA/FTAs with Peru/Colombia/Panama/Korea/UK
Tendering Procedures: All interested suppliers may submit a bid
Competitive Procurement Strategy: Lowest/Lower Bid
Comprehensive Land Claim Agreement: No
Nature of Requirements:

Canadian Armed Forces (CAF) has a requirement to replace the obsolete portable breathing air diving compressors use by Royal Canadian Navy (RCN) Clearance Divers, Army Combat Divers, Search and Rescue Technicians and Port Inspection Dive Teams with new gas and electric compressors.

The Procurement will be for the replacement of fifty five (55) portable gasoline driven breathing air diving compressors and twenty (20) portable electrically driven breathing air diving compressors. For Canadian Armed Forces operational requirements, the contractor must provide the same Brand/Model compressor blocks across the line.
The delivery must be on or before the 31 March 2023.
The Request for Proposal includes the Mandatory Technical Criteria.

Questions and Answers Set 1 Click "Show more"

Question 1:

I only have one question. While it does not state it, you need continuous run machines, and the electric power assumes single phase 230 - and either 50 or 60 Hz.

Answer 1:

CAF portable diving compressors are not considered continuous run compressors. At times, the compressors are operated for multiple hours, but not in continuous auto mode. The compressors are only operated while charging the dive cylinders and then turned off by the operator once charging has been completed. They are not/will not be connected to a cascade system and left in auto.

I am inviting you to read 3.2.20 of the TSOR for the voltages requirement. 3.2.20 "All electric motors of the portable breathing air diving compressors must be manufactured to operate with dedicated terminal block enclosed of 208 VAC and 460 VAC, 60 Hz three (3) phases"

Questions and Answers Set 2.

Question 1
Will the government of Canada be interested in a trade in value for the 75 compressors being replaced?

Answer 1
There are more than 75 compressors at base holdings and all can be sold, but are in varying degrees of operational/reparability status and depends on procurement/disposal regulations.

Note from the Contracting Authority: If valuable the compressors should be sell as surplus on GCSurplus in the best interest of Canada and to fair for all buyers.

Question 2. Clause 3.1.1
Typically the gas driven and electric motor driven compressor packages will have a similar part number with the letter designate 3E for electric motors and G for gasoline engines.
The brand and model of the compressor blocks will be the same in all units. Is this interpretation correct?

Answer 2
Correct, the electric driven and gasoline driven compressors should be identical with the exception of the prime mover and associated components to support the prime mover.

Question 3. Clause 3.2.1
I note the PMV (pressure maintaining valve) is not on the CRN list, please confirm this is to be included in the CRN requirements.

Answer 3
It was not a requirement on previous procurements for similar equipment.

Question 4. Clause 3.2.3
Typical CO monitors have an alarm set point at 5 PPM, is this acceptable or is 3 PPM mandatory? The current CSA standard CSA Z180.1:19 states a 5 PPM CO alarm threshold set point.

Answer 4
The DND D-87-003-000/SG-001 Purity of Compressed Breathing Air and Gases for Divers is based off the CSA Z275.2 diving air standard, which states, carbon monoxide shall not exceed 3 ppmv. The Z180.1 has the lower acceptable limit of 5 ppmv, which is not sufficient to meet the air quality standard for CAF diving air purity.

Question 5. Clause 3.2.7
There are 3-stage and 4-stage compressors which meet the 9 SCFM charging rate and the stated 300 Barg pressure requirements. The units being replaced are 4-stage compressors, is the idea to stay with this 4-stage block design or is a 3-stage block acceptable?
A 3-stage compressor block weighs 50 KG
A 4-stage compressor block weighs 59 KG
Please advise which design of compressor is to be offered; a 3-stage or 4-stage, alternatively both can be offered for evaluation and selection?

Answer
A 4 stage compressor is preferred due to the lower operating temperatures.

Question 6. Clause 3.2.12
The standard compressor frame supplied has items attached to the standard upper protective frame, is an added removable protective frame still required? Would a removable box be an option to protect the compressors during transport and deployment?

Answer 6
If the current standard frame supplied protects all the components from accidental damage, then an additional frame is not required, however, the standard frame supplied has to meet the required dimensions listed in paragraph 3.2.13 of Annex A of the RFP.

Yes, a removable protective box would be acceptable to cover the compressors during transport.

Questions and Answers Set 3

1. Clause 3.2.17
The application of the units is subject -20C to +38C temperature ranges.

2. Clause 3.3.2
Storage will be at -40C to +50C temperature ranges

Due to the temperatures ranges and considering these units may have extended periods of storage a PLC based control system could be problematic, will a control system based on timers and relays with fault lights be acceptable as it provides temperature and function stability?

Answer 1

If a company wants to use an alternate to a PLC based control system, the Technical Authority have no objections.

Questions and Answers Set 4

Question 1:
Clause 3.2.11

1. Please confirm if the steel base listed is to be a part of the compressor frame or something separate. Our compressor frame is aluminum as well as the base pan which matches the load requirement and reduces overall weight, is this also acceptable. The frame can also be supplied with a steel base pan with more weight. Both the aluminum and the steel base assembly will accommodate the rail mounting system as shown in Clause 3.2.13, photos 1 & 2.

Answer 1

The steel base listed can be either a standalone base to support the compressor components or part of the frame assembly. Preferable if the base and frame are detachable from each other to allow installation in the mobile dive response vehicle, if the frame dimensions are greater than the dimensions listed in para 3.2.13 of Annex A of the RFP.

An aluminum base plate is of sufficient thickness to accommodate the overall weight of the compressor assembly is acceptable.

Question 2 and 3:
Clause 3.2.13, photos 1 & 2

2. On picture 1 the older compressors are shown sliding into a rail system, will this type of mounting be the same for the new units and if so will the dimensions of the rails be available to the selected vendor to match this installation method?

Answer 2

As long as the dimensions of the compressor unit is in accordance with the dimensions listed in para 3.2.13 of Annex A of the RFP, then the sliding compressor support of the mobile dive response vehicle can be modified to support the compressor, however, if required, dimensions can be provided by COB on Friday, 25 March 2022.

Question 3

3. Does this truck mounting apply to the gasoline engine units only or both the gasoline and electric driven units?

Answer 3

Only the gasoline driven compressor is mounted in the mobile dive response vehicle.

Questions and Answers Set 5

Question 1

In response to subject solicitation, would you please extend the due date for two weeks to allow all interested suppliers prepare a proposal?

Question 2

Following the analysis of the request for proposal, we ask if it is possible to postpone the closing date of the request for proposal by 4 weeks for a closure on May 10, 2022. This time will be required for us to prepare and complete our technical proposal (section 1). We have challenges due to global supply chains for the required components and more importantly, considering the quantities involved. This will not affect the required delivery time,
i.e. March 31, 2023.

Answer 1 and 2

No, the closing date will not be extended due to high priority request for new compressors.

Qestion 3

Regarding the above-mentioned solicitation, as mentioned in the section 3.5.1 of the TSOR:
The Contractor must comply with the requirements of the International Organization for Standardizations (ISO) 9001:2015 Quality Management Systems Requirements. Current edition and copy of Contractor’s ISO Certificate provided by the Contractor.

As our partners have ISO 9001:2015, is it possible to change the term "Contractor" to "Contractor or Sub-contractor"?

Answer 3

Yes, at your request the solicitation will be amended to change the term "Contractor" to "Contractor or Sub-contractor" in the section 3.5.1 of the TSOR.
Delivery Date: Above-mentioned

The Crown retains the right to negotiate with suppliers on any procurement.

Documents may be submitted in either official language of Canada.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
PW-__ML-066-28559
Solicitation no.
W8482-217974/A
Buyer
Public Works and Government Services Canada
Notice type
Request for Proposal
Method
Competitive - Open bidding
Procurement category
*GD
Trade agreements
*Canada-Korea Free Trade Agreement (CKFTA) *Canadian Free Trade Agreement (CFTA) *Canada-UK Trade Continuity Agreement (Canada-UK TCA) *Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP) *Canada-Panama Free Trade Agreement *Canada-Peru Free Trade Agreement (CPFTA) *Canada-European Union Comprehensive Economic and Trade Agreement (CETA) *Canada-Colombia Free Trade Agreement *World Trade Organization Agreement on Government Procurement (WTO GPA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

GSIN
*N4310 — *Compressors and Vacuum Pumps

Delivery & regions

Province
Quebec
Regions of delivery
*Quebec (except NCR)

Key dates

Published
February 28, 2022
Closes
April 12, 2022
Amendment no.
006

Contact

End-user
Department of National Defence
Sign up free to see the contact details

Award history

2 past awards in this classification and 0 likely incumbents from this buyer. Pro shows who won and for how much.

Upgrade to Pro

Live tenders

Royal Canadian Navy (RCN)Closing today

Furniture Installation

Indigenous set-asideGoods
75 MATCHView →
Department of National Defence (DND)1 day left

4 X Winter Loaders Rental

Services
78 MATCHView →
Department of Public Works and Government Services (PSPC)2 days left

Solicitation of Offers – FR-EN Translation Services - General and Administrative Texts Field- Tier 2

Services
79 MATCHView →