Title
COOP Wharf Elevation Works at L'Étang-du-Nord Fishing Harbour, Magdalen Islands, Quebec
Reference number
cb-911-30144425
Solicitation number
30008580
Publication date
2026-10-27
Tender closing date
2026-11-12T13:00:00
Expected contract start date
2026-11-23
Expected contract end date
2027-07-31
Unspsc description
*Marine construction services
Procurement category
*CNST
Notice type
Request for Proposal
Procurement method
Competitive - Open bidding
Selection criteria
Lowest Price
Trade agreements
*Please refer to Tender Description or Tender Documents
Regions of opportunity
*Quebec (except NCR)
Regions of delivery
*Prince Edward Island
Contracting entity name
Department of Fisheries and Oceans (DFO)
Contracting entity address line
200, Kent Street
Contracting entity address city
Ottawa
Contracting entity address province
Canada (+1)
Contracting entity address postal code
K1A 0E6
Contracting entity address country
Canada
Contact info name
F••••••• L•••••
Contact info email
f••••••••@•••••••.••.ca
Contact info address line
•••, •••• ••••••
Contact info province
•••••••
Contact info postalcode
••• •••
Contact info country
••••••
Attachment
https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/111204/30008580---itt.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/111204/30008580---specs-%281.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/111204/30008580---addenda---addedum-1.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/111204/30008580---plans-%28eng-fr-%281.pdf
Tender description
The elevation works for the COOP Wharf at L’Étang-du-Nord Fishing Harbour in the Magdalen Islands include, but are not limited to, the following work:
• Partial demolition of existing wharves and reuse of recovered stone.
• Installation of a containment curtain and a floating boom to retain driftwood and suspended particles during wharf demolition or dredging activities required for preparation of the granular foundation.
• Excavation of the seabed (contaminated sediments) to allow for the installation of the granular foundation for the new crib structures.
• Work required for the installation of the granular foundation of the new timber crib wharves.
• Supply of all materials required for the construction of ACC-treated timber crib wharves.
• Demolition of the riprap protection on one side of the wharf approach.
• Placement of pit run and granular materials for the widening of the wharf approach.
• Stockpiling (according to potential contamination) and characterization of dredged materials to construct the granular base for the new crib structures.
• Disposal and/or beneficial use of dredged sediments at authorized sites.
• Civil works for the installation of electrical and potable water services to the new wharf.
• Paving works for the wharf approach.
• Supply and installation of electrical distribution, lighting and water system components.