The Sir Frederick G. Banting Research Centre was constructed in 1978. The building is divided into 3 wings known as the laboratory/office wing, the central communal wing, and the animal research wing with a total gross floor area of approximately 34,000 m² (366,000ft²). The washrooms and kitchenettes are as originally built and require upgrades. HC require that 2 washrooms and 1 kitchenette be upgraded on the west side of the second floor corridor of the Laboratory Wing. (Washrooom & Kitchenete Type A and Washroom Type C only)
Health Canada will coordinate site access availability for information gathering and construction. Health Canada will be on site or available during the entirety of this project.Health Canada may, at any time, verbally suspend the work in whole or part. If required, within 24 hours of the suspension, the Project Manager must provide the Contractor with a written notification indicating the effective date and time of suspension, the intended duration, and reason for the suspension ( e.g. non-compliance of Health and Safety regulations and/or encountering unexpected contamination).To provide labour, materials and equipment to upgrade the 2 washrooms and 1 kitchenette on the west side of the second floor corridor of the Laboratory Wing as per the attached scope of work prepared by DL Studios Plus as seen as Annex B