SCOPE OF WORK
The Contractor shall provide all necessary labor, materials, equipment, project management, and contract administration work required to complete abatement of hazardous materials and demolition work of specified buildings in Meanook. The project shall be completed in three (3) stages, requiring three (3) mobilizations and demobilizations in 2020, 2021, and 2022 respectively. The Contractor will complete the required disconnects (Mechanical, Electrical, Water, Sewage, etc.), removal, and disposal of all remaining equipment, furniture, or anything inside the buildings. The contractor must consider and plan in consequence that there is no utility available on-site. There is no electricity, no water, no sewage, and no gas available on-site.
Project progress meetings are required at regular intervals with the Departmental Representative, consultant, and the contractor. The specific intervals will be determined in more detail at the “start-up” meeting.
The work on this contract includes coordination and cooperation with Environment and Climate Change Canada (ECCC) project manager and ECCC staff working on the site. Exact details are found in the contract technical specifications provided in the tender documents.