Oona River dredging at Oona River, BC. The work under this project generally consists of maintenance dredging within the Oona River Small Craft Harbours site moorage basin, transportation and placement of dredged material within the designated placement area, construction of staged rock berm containment works, installation of geotextile separation layers, construction of a dredged material unload platform, placement of topping materials, and construction of the environmental offsetting salt marsh and large wood debris. All work including clean-up and demobilization must be completed by March 31 , 2027.
Lowest Price
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro