Trade Agreement: NAFTA/AIT/Canada FTAs with Peru/Colombia/Panama
Tendering Procedures: All interested suppliers may submit a bid
Attachment: None
Competitive Procurement Strategy: Best Overall Proposal
Comprehensive Land Claim Agreement: No
Nature of Requirements:
Fab & Del 18-20' Jet Boat w/Trailer
K4E21-130731/B
Elkington, J.R.
Telephone No. - (250) 363-3391 ( )
Fax No. - (250) 363-3960
REQUIREMENT
To carry out the design, construction, test, trial and possible
delivery of one (1) 5.9m (19ft) Aluminium Jet Boat with trailer.
DELIVERY
Delivery to Cranbrook, BC, is requested to be on or before Sept
26 2014.
MANDATORY CONSTRUCTION STANDARDS
1. Transport Canada Marine Safety Regulation TP 1332
"Construction Standards for Small Vessels", which incorporate
references to ABYC standards for equipment such as fuel tanks
and fuel systems, as well as tank space ventilation, and ISO
standards for stability, loading capacity, etc. as delegated to
ISO 12217-1.
Http://www.tc.gc.ca/MarineSafety/Directorate/TP/tp1332/tp1332e.ht
m
2. Canadian Standards Association C22.2 NO. 183.2-M1983 (R1999)
"Standards for D.C. Electrical Installations on Boats and ABYC
'E' electrical standards."
INSPECTION/QUALITY ASSURANCE/QUALITY CONTROL
1. The Contractor must prepare an Inspection and Test Plan
(ITP) for this project.
2. The Contractor must conduct inspections in accordance with
the ITP.
3. The Contractor on the inspection record, test or trials
sheets as applicable must record the results of each inspection.
The Contractor must maintain files of completed inspection
records.
The entire Inspection process is outlined in Annex D of the
Request for Proposal.
SOURCING STRATEGY
This procurement is subject to the Agreement on Internal Trade
(AIT), NAFTA, and WTO.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.