WORK OF THIS CONTRACT
1. Work to be completed under this Contract includes, but not limited to, supplying all materials, equipment, products, labour, and transportation for the Castle Provincial Park – Lost Creek Bridge Replacement project. Work of this Contract is comprised of the following:
.1 Prime Contractor responsibilities
.2 Project Management and Coordination
.3 Safeguarding of work areas
.4 Environmental Requirements
.5 Removal and Salvage Existing Bridge Structure and Abutments
.6 Vegetation Removal
.7 Excavating and Grading
.8 Topsoil Stripping and Placement
.9 Soil Decompaction
.10 OHV/Multi-Use Bridge and Abutment Installation
.11 Gabion Basket Installation
.12 Heavy Rock Riprap Placement
.13 Seeding and Hydromulch
.14 Miscellaneous and incidental works.
.2 Location: Castle Provincial Park - Lat / Long is: 49°27’41.91"N 114°32’29.45"W
WORK OF THIS CONTRACT 1. Work to be completed under this Contract includes, but not limited to, supplying all materials, equipment, products, labour, and transportation for the Cas...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.