Stantec Consulting Ltd. on behalf of Alberta Infrastructure
The Work is comprised of, but is not limited to, approximately: 1,000 lin.m of Storm Mains, 10ea Storm Manholes, 15ea Catch Basins with Leads, 638 lin.m of Sanitary Mains, 6 Sanitary Manholes, 1,138 lin.m of Water Mains, 9 Temporary Flush Points, 13 Water Main Valves, 14,000 sq.m of Asphalt Roadways, 3,175 lin.m of Concrete Curb & Gutter, 5,625 sq.m of Concrete Flatwork
Stantec Consulting Ltd. on behalf of Alberta Infrastructure The Work is comprised of, but is not limited to, approximately: 1,000 lin.m of Storm Mains, 10ea Storm Manholes, 15ea C...
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.