Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowCanada's economy has found its footing. But is it enough to survive the U.S. trade war?· CBCBryan Yu: B.C. economy braces for tariff hit as small-business optimism falters· Business in VancouverLook West: Jobs and Prosperity for a Stronger BC and Canada - Province of British Columbia· Government of British ColumbiaProposed Tariffs Stack onto the Ongoing Investment Freeze· Canadian Chamber of CommerceGas prices drove inflation up to 3% in July as food cost pressures eased· The Globe and MailBUSINESS BEAT – More positive news for Canada’s economy· ArmchairMayor.caAlberta’s current, former premiers offer contradicting views on U.S. counter-tariffs· CTV NewsGovernment of Canada invests $5.6 million to support Black entrepreneurs in Alberta· canada.caCyclical rebound in Canada and structural strength in the U.S.· rbc.comCanada’s economy expected to rebound by year’s end: Deloitte· BNN BloombergBusiness News: Canadian economy grows 0.3% in May· Global NewsAmid trade upheaval, Canada’s most sustainable firms are building a more resilient economy· Corporate KnightsTechnical recession, falling financial confidence hurting businesses, workers: survey· Canadian HR ReporterThe false promise of sovereignty economics· The Hub | More Signal. Less Noise.
← All tenders
Infrastructure

Infrastructure - Invitation to Bid - Plan No.: 024177 EDMONTON - GOVERNMENT CENTRE - Powerhouse Chiller Replacement

Other
Estimated value
Not disclosed
Deadline
September 24, 2026
Published
September 2, 2026
Type
Other
Explore similarMaterial Handling and Conditioning and Storage Machinery and AccessoriesAlberta

Full description

.1 Work is to be executed within an active Powerhouse facility that will remain operational throughout the construction period. The Contractor shall plan and coordinate the Work in a manner that accommodates ongoing facility operations and continued occupancy by Government of Alberta personnel.
.2 Existing facility operations are critical to building functionality. Construction activities shall be planned and coordinated to maintain required system operation throughout the project, except where approved outages have been authorized by the Province.
.3 Replacement equipment and associated controls shall, at a minimum, maintain operational functionality consistent with the systems being replaced, including integration with existing facility operational practices and remote operating capabilities. Any identified discrepancy between the Contract Documents and these requirements shall be brought to the attention of the Consultant.
.4 The Contractor is advised that existing cooling systems may be required to remain operational during portions of the construction period. Scheduling and sequencing of the Work shall account for seasonal operating requirements and facility cooling demands.
.5 The Contractor is advised that project sequencing may require portions of the existing cooling system to remain operational or alternatively require portions of the new cooling system to be commissioned and operational by Fall 2027, while construction activities remain ongoing. Proponents shall account for this requirement when developing their construction approach, schedule, outage planning, and temporary operating strategies.
.6 The Contractor is advised the controls design approach is intended to maintain compatibility and integration with the existing Delta EMCS platform used throughout the Powerhouse, including the Cooling Tower system, and to support continuity of facility operations during and after implementation.
.7 The removal of two existing chillers, associated condenser water pumps and chilled water pumps. Replacement of the equipment with new chillers and pumps.

AI Summary

.1 Work is to be executed within an active Powerhouse facility that will remain operational throughout the construction period. The Contractor shall plan and coordinate the Work i...

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
Plan No.: 024177
Buyer
Infrastructure
Method
ITB
Estimated value
Not disclosed
Source
alberta

Classification & terms

UNSPSC
UNSPSC 24000000 — Material Handling and Conditioning and Storage Machinery and Accessories

Delivery & regions

Province
Alberta

Key dates

Published
September 2, 2026
Closes
September 24, 2026

Live tenders

Red Deer County1 day left

Red Deer County - Invitation to Bid - Junction 42 Reservoir Expansion

81 MATCHView →
Edmonton Catholic Separate School Division1 day left

Edmonton Catholic Separate School Division - Request for Proposal - Q-2026-64 Refrigeration and Air Conditioning Services RSO

75 MATCHView →
Ville de Pointe-Claire.1 day left

La fourniture et la livraison d’un (1) chariot élévateur usagé ou neuf, d’année 2019 ou plus récent, en bon état

Goods
79 MATCHView →