Compressed Gas Storage Facility Canada Centre for Inland Waters 867 Lakeshore Rd.Burlington, ON, L7S 1A1SCOPE OF WORKWork of this Contract includes the construction of a new compressed gas storage facility at the Canada Centre for Inland Waters, located at 867 Lakeshore Road in Burlington, Ontario L7S 1A1. In particular, the work, briefly described below, includes, but is not necessarily limited to the following:The installation and maintenance of hoarding, dust protection, and construction signage around the area of work and staging area, as described in the Project Specifications;Removal and disposal of the existing fencing, asphalt pavement, concrete curbs, soft landscaping material, tree, and subgrade material within the new concrete pad and asphalt walkway installation area, as indicated on the Drawings;Construction of new reinforced cast-in-place concrete foundations for the new framing and roof structure, as indicated on the Drawings;Construction of a new reinforced cast-in-place concrete slab-on-grade on new engineered granular material, as indicated on the Drawings;Construction of new bollards on new reinforced cast-in-place concrete foundations around the perimeter of the new storage area, as indicated on the Drawings;Construction of a new reinforced concrete masonry unit wall within the storage area, as indicated on the Drawings;Supply and installation of new galvanized steel grates and frames over slab-on-grade recesses, as indicated on the Drawings;Supply and installation of new galvanized structural steel framing and roofing system, as indicated on the Drawings;Design, supply and installation of new louvers around the perimeter of the new storage area, complete with new lockable door at the storage area entrance. Contractor to submit engineered shop drawings to the Consultant for review;Installation of a new asphalt pavement walkway to the entrance of the new storage area, as indicated on the Drawings;Reinstatement of pre-existing finishes around the new storage area, including asphalt pavement, concrete curbs, soft landscaping, etc., as indicated on the Drawings;Installation and commissioning of a new lighting system within the storage area, as indicated on the Drawings;Installation of new chain-link fencing system where indicated on the Drawings;Supply and installation of new compressed gas and propane cylinder storage cabinets within the storage area;Repair of all areas damaged by construction activity; specifically, the Contractor shall repair all damages resulting from the construction to the satisfaction of the Consultant, including repair of damages finishes, landscaping, fencing, etc., in accordance with the Project Specifications;Final cleaning of the structure, finishes, landscaping, etc., and the disposal of all waste products and/or debris generated by the construction activity, as well as any material present in the work areas prior to the commencement of the work. The areas requiring cleaning shall consist of all areas affected by the work.The work on this contract includes coordination and cooperation with building personnel working on the site. Details are found in the contract drawings and specifications.