The Scope of Work for this Contract is to remove and dispose the existing two spans (6.1 m – 6.1m) treated timber deck/ girder bridge on timber piles and to supply, set up and drive galvanized and plain steel H piles at abutments, SPCS abutments backwalls and wingwalls including new steel H-piles abutment caps with stiffener plates, Class 1 heavy rock riprap, fabrication, delivery and erection of single span (1 - 14m) long type SL-510 prestressed girders, backfill at bridge ends, supply and installation of new TL-2 low height thrie beam bridgerail and approach rail transition, approach road guardrail, roadway work, and supply and installation of silt fence.