Work under this contract includes, but is not limited to, the provision of all labour, materials, and equipment required to:
Procure surveyor to complete layout;
Design, supply and install foundations for two [2] new AtoN (Aid to Navigation) towers using provided geotechnical report and capable of supporting the associated load as determined by the project engineer;
Design and construct a culvert style entrance into the site and gravel access-way running to both new AtoN tower locations;
Fabricate two [2] AtoN towers using supplied drawings in Appendix B3;
Transport two [2] AtoN towers to the site;
Erect the new AtoN towers, including all appurtenances;
Pick up day-marks and associated hardware from CCG and install on new towers;
Remove to grade and dispose of the existing rear range;
Execute close-cut clearing to establish visibility corridor;
Restoration as necessary; and,
Erect and maintain any and all measures required to complete the works in consideration of the reasonably anticipated weather conditions during the construction period
Work under this contract excludes:
Installation of lanterns and associated equipment; and,
Fabrication of lanterns, day-marks and associated equipment