Construction work includes: Mobilization and demobilization; Site access improvements for materials and equipment; Environmental management; Building foundation preparation and construction; Installation of hatchery water supply, domestic and fire protection waterlines, sanitary and storm water piping, culverts, electrical conduits, communication, and other utilities; Construction of a hatchery building, interior incubation, fish culture areas and all finishing works; Mechanical and electrical systems; Utility and power supply connections; Plumbing of outdoor rearing tanks; Construcion of an aeration tower, head tank and water supply connections, pump installation, associated controls and water supply connections; Installation and commissioning of backup power supply systems; Installation of hatchery process water monitoring, controls, and automation systems; Installation of fencing, site grading, and construction of road surfaces, and; Grading and construction of site road/pathways, environmental controls, and overall site drainage.