5P468-23-0331/A Stage 2 - Lakeshore Trail Repair, Riding Mountain National Park
REQUIREMENT
Parks Canada requires repairs to portions of the Lakeshore Trail including:
Approximately 2.5 km Raised Trail Tread repair . Creation of appropriate drainage through the use of grading, ditching, underground piping infrastructure. Addition of appropriate erosion control including vegetation management and rip rap placement along the shoreline. Repair of Docks and bunks. Construction of 2 connector trail segments.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings.
Only qualified suppliers have been invited to bid.