DELIVERABLES / SCOPE OF WORK
The Slipway Construction at the fishing harbour of Pointe aux-Loups in the Magdalen Islands region includes, without limitation, the following work:
.1 The demolition of remaining old hauling slip within demolition limits
.2 Recovering of granular material and disposal of other demolition material not reused in the new structures.
.3 Roc and in place soil excavation to develop slipway granular base
.4 Transportation and placing of DFO stone actually stored at a quarry located in l’Étang-du-Nord.
.5 The supply and installation of granular material to build access road to slipway
.6 The supply and installation of precast slabs.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro