Work Description:The scope of work includes the supply of materials, equipment, tools, services, labour, and all things necessary for removal of existing overhead lines and installing new electrical cable down the length of the timber pier at Port Clements Small Craft Harbour site.Work includes but not limited to installation and modification of existing and new electrical system, BC Hydro coordination, new street lights, any required grounding and bonding of the electrical systems per CSA and BC Hydro standards; additional electrical work as specified within the electrical drawings.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
10 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro