Objectives of the Requirement
The objective of this contract is to provide all the labour, material and equipment required to perform work for the replacement of two sections of the roof of the SFBRC facility and as depicted in Annex “A” Specification Documents. This work will ensure the continued integrity of those two sections of the roof against infiltration of water and moisture.
The construction phase of this project must be finalized by end of March 2018. The Contractor will take into account the fact the facility will be continuously occupied during construction work.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
1 past awards in this classification and 4 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro