MAJOR RENOVATIONS, FEDERAL BUILDING AT 715 PEEL STREET, MONTREAL
PROJECT DESCRIPTION
Summary of work to be done at the federal building at 715 Peel,
for the CBSA and CIC:
The Canadian Border Services Agency (CBSA) and Citizenship and
Immigration Canada (CIC) are located in the Federal Building at
715 Peel. Each of these two governmental departments will
undergo a major refurbishment project.
Planning is at an advanced Design Development stage. A
significant amount of information is available to facilitate the
understanding of each project.
As part of the work for each of the two projects, the following
activities will be required, without limitation:
- Familiarise oneself with the advanced Design Development
documents, the Supplementary Electromechanical Technical Brief
and all other available documentation.
- Conduct surveys and drawings following the review of the
available information.
- Produce complete construction documents while performing all
required services.
- Locate the necessary building services and identify connection
points.
- Plan for all temporary spaces.
- Rearrange client spaces on multiple levels, in compliance with
the Workplace 2.0 initiative standards
- Connect all furniture and equipment.
- Coordinatewith Shared Services Canada for IT requirements.
- Assess and analyze existing security systems and integrate new
requirements. New and existing components must be compatible and
adequately detailed.
- Respect the heritage requirements.
- Obtain Silver LEED-CI certifications.
The implementation of these projects requires planning over
several phases. It is expected that CIC be the first project to
undergo contruction work, followed by CBSA. The multiple phases
of work must be analyzed and validated by the consultants. The
building's services cannot be interrupted in order to maintain
the operations of the other occupants in the building.
The Federal Building at 715 Peel must comply with a set of
security requirements. Visitors are accompanied at all times by
commissionaires.
SCHEDULE
It is anticipated that the contract award be expedited following
the closing of the RFP. Work should begin shortly thereafter.
Schedules for both projects will have to be defined by the
consultant in coordination with the construction manager. The
schedule will identify all construction phases, including
temporary work. The two renovations projects will have to be
completed within a tight schedule. Compliance with the delivery
dates of these renovations projects is essential.
The CIC renovation project must start first; the CBSA project
will follow. Overlapping of both construction projects should be
considered in order to meet the schedule.
Substantial completion of the CBSA Major Renovations project
must be achieved by October 27th 2017. Employee move-in must be
completed by November 5th 2017.
It is strongly recommended to complete the CIC Major Renovations
project as soon as possible, to allow CBSA to meet its
substantial completion target date.
BIDDER'S CONFERENCE AND VISITS
It is MANDATORY that the Bidder or a representative of the
Bidder attends at least one of the two Bidder's conferences and
visits of the work site. Arrangements have been made for the
conferences and site visits to be held at 1020 Rue Saint Antoine
Ouest, Montreal, QC H3C 1B2 on the following dates and time:
Conference and visit, session 1 - 16 July 2015, at 13:30 EDT;
Conference and visit, session 2 - 6 August 2015, at 13:30 EDT;
Bidders should communicate with the Contracting Authority no
later than 48 hours before the session to confirm attendance,
provide the name(s) of the person(s) who will attend and specify
their preferred language of interaction (English or French).
PWGSC reserves the right to limit the number of participants to
two (2) persons per bidder.
Bidders will be required to sign an attendance sheet and a
Confidentiality Agreement.Bidders who do not attend one of the
MANDATORY conferences and site visits or do not send a
representative will not be given an alternative appointment and
THEIR BID WILL BE DECLARED NON-RESPONSIVE.
CONFIDENTIAL INFORMATION FOR BIDDING
In order to prepare a bid in response to the bid solicitation,
suppliers must have access to information that is confidential
or proprietary to Canada or a third party. It is a condition of
the bid solicitation that bidders sign a Confidentiality
Agreement in the form set out in Attachment 1 of the of the bid
solicitation documents before being given access to such
information at a facility identified in the bid solicitation or
before it is provided to them as part of the bid solicitation.
In order to receive said documents, Bidders must make a written
request to the contracting authority at
j••••••••@••••••••.••.ca. The request must include the
Confidentiality Agreement duly signed. PWGSC will then upload
the documents on the Proponent's FTP site. The site's address as
well as a username/password must be provided.
Bidders who do not obtain these documents during the period of
RFP will see their BID DECLARED NON RESPONSIVE.
SECURITY REQUIREMENTS
This procurement contains a security requirement that must be
met AT THE DATE OF BID CLOSING. For further instructions please
consult "Supplementary Instructions" SI9, "Security related
requirements" and "Supplementary Conditions" SC01 "Security
related requirements"of the bid solicitation documents.
This PWGSC office provide procurement services in French and
English. / Ce bureau de TPSGC fournit des services d'achat au
public en français et en anglais.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.