DELIVERABLES / SCOPE OF WORK
The work for this project consists of the furnishing of all plant, labour, equipment and materials for slipway reconstruction at River of Ponds, Great Northern Peninsula, Newfoundland and Labrador, in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the contract.
In general, work under this contract will consist of, but will not necessarily be limited to, the following:
Demolition, removal and disposal of all existing hardwood timber decking members and PT support beams.
Demolition of all concrete supports and reuse these supports in the backfill of the new work to be completed.
Demolition, removal and disposal of the existing steel support beams, brackets and associated steel items as indicated on drawings
Demolition, removal and disposal of the existing asphalt pavement as indicated on the accompanying drawings.
Construct a new timber slipway complete with rock fill, concrete footings, timber cribs, concrete piers, timber beams, hardwood runners and timber wood decking as indicated on accompanying drawings.
Construct a new concrete boat launch way ramp 41.2 m long x 4.9 m wide complete with wheel guard as shown on drawings.
Construction of new reinforced concrete upland apron along the top edge of the new slipway as shown on drawings.
Supply and installation of new armor stone along the new launch way as shown on drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification section on Health and Safety before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.