The Water Survey of Canada (WSC) maintains a cableway system across the Finlay River above Akie River, British Columbia, for the purpose of collecting hydrometric data. Safety deficiencies have been identified at the station and a full cableway rebuild is deemed to be required. WSC wishes to engage an experienced contractor to decommission the existing infrastructure and re-build the new cableway as per the new design.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 4 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro