Wharf Reconstruction, Middle Arm, NLThe scope of work for this project consists of the furnishing of all plant, labour, equipment and material for wharf reconstruction in Middle Arm, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.In general, the work under this contract will consist of, but will not necessarily be limited to, the following:.1 Demolition and removal of the existing wharf and retaining cribwork, as shown on the drawings. All debris removed is to be disposed of at an approved waste disposal site. The Contractor will be required to obtain the necessary approvals from the operators of the waste site for the disposal of the demolition debris. Note that creosote timber is present, which will require special handling and disposal..2 Construction of a new crib marginal wharf on a rock mattress, as indicated on the drawings..3 Supply and installation of structural timber for cribwork, wheelguard, wheelguard blocking, beams, decking and associated hardware..4 Supply and installation of rock fill, granulars and rip rap, as noted on the drawings..5 Supply and installation of ladders, mooring cleats and mooring rings, as noted on the drawings..6 Uplands scarification and regrading with Class “A”.FAMILIARIZATION WITH SITEBefore submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance o