The scope of work for this project is the provision of construction activities for the reconstruction of a slipway at Francois, NL, as is more specifically described below and in the Drawings and Specifications, subject to all terms and conditions of the Contract.
In general, the work under this contract consists of, but will not necessarily be limited to, the following:
.1 Demolition and removal of the existing slipway cribwork, as shown on the drawings.
.2 Demolition and removal of a portion of the existing slipway beams, as shown on the drawings.
.3 Demolition and removal of the existing slipway decking and runners, as shown on the drawings.
.4 Cribseat excavation, as required, to facilitate placement of the new slipway cribwork and to ensure full support is provided under the new cribwork.
.5 Reconstruction of the demolished sections of cribwork with new cribwork, as detailed on the drawings. Cribwork may have to be scribed to hard bottom.
.6 Supply and installation of new treated timber beams, decking and runners, as detailed on the drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, site remoteness, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.