The current floating docks for the fishermen of Baie Comeau are in a precarious state because their anchoring pieces are too loose and the pontoons move too much in times of storm. In addition, the chains are not suitable regarding the location of the anchor blocks on the seabed, and the project involves building 14 new floating docks and replacing existing floating docks. Electrical and fish handling equipment will be uninstalled and reinstalled during construction (conveyor, gangway, electric stations, landing and services pontoons).
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro