Tendarix.ca
BUSINESS NEWS
Preserving Canada’s sovereignty and economic capacity· Business Council of CanadaOpinion: If Canada wants economic security, it must tolerate a bigger government hand in business· The Globe and MailGrain elevator expansion supports local farmers and Canadian economy· Northern Ontario BusinessStephen Tapp: Canada’s low productivity is making young people less optimistic about the economy· Financial PostHow one Canadian company’s move to Texas reflects economic pressures facing Canadian businesses - Radio-CanadaCanadian businesses calling for tax reform, less red tape in federal budget· BNN BloombergCanadian dollar climbs to seven-week high as US election results shake markets· Philippine Canadian InquirerCanada's next budget to be unveiled this week amid U.S. trade war, economic uncertainty· CBCHigher fuel costs and tariffs expected to slow Canadian economy· DiscoverMooseJawTrump's midterm defeat gives China, Canada, India and Africa's largest economy fresh leverage in US trade talks· Business Insider AfricaGrowing the Oil and Gas Sector Helps Grow Canada’s Economy· Canadian Chamber of CommerceGlobal trade is changing how the Canadian economy works· Bank of CanadaFiscal and monetary policy are not at odds, Bank of Canada's Macklem tells MPs· BNN BloombergCanadian Quarterly Economic Forecast· TD BankEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global News
← All tenders
Correctional Service of Canada (CSC)

Remplacement des toitures – BC18 and BC24 – Établissement de Beaver Creek – secteur à sécurité minimale

Other
Estimated value
Not disclosed
Deadline
August 26, 2026
Published
August 4, 2026
Type
Construction
Explore similarBuilding and Facility Construction and Maintenance ServicesOntario
Awarded
This contract has been awarded. Details are drawn from the federal award notice for this solicitation.
Winning supplier
MWI Metal Roofing Ltd
Contract value
CAD $332.2K
Award date
2026-10-06
Supplier location
Kilworthy, Ontario
Directed Contract

Full description

The Correctional Service Canada (CSC) requires a qualified contractor to complete the Roof Replacement for buildings BC18 (Unit 2) and BC24 (Unit 3) at Beaver Creek Institution.

Objectives:
CSC requires a qualified contractor to replace the existing aged asphalt shingle roof with a durable standing seam roofing system that enhances the structural integrity, improves weather resistance and reduces long term maintenance costs.

Deliverables:
a)The Contractor must ensure that all employees performing work at elevated heights have a valid Working from Heights certification.
b)The Contractor must provide all required equipment, including their own equipment for working at heights to complete the work in the project.
c)Measurement & Verification
1.Verify all roof dimensions and conditions prior to ordering materials and commencing work.
d)Preparation
1.Inspect the roof deck and structure for damage, rot and deficiencies. Report any necessary repairs and provide a quote for additional work.
2. Remove existing vents.
3.Ensure the roof deck is clean and suitable for installation.
e) Installation
1.Supply and install a full-coverage synthetic roof underlayment beneath the metal roofing system across all roof areas
i. Underlayment must be premium grade, non-perforated synthetic material suitable for use under metal roofing systems
ii. Minimum material weight of approximately 200 g/m² (or equivalent)
iii. Underlayment must provide a continuous secondary water-shedding barrier over the entire roof deck
iv. Material must meet or exceed industry standards for water resistance, tear strength, UV stability, and slip resistance
v. Installation must be completed in strict accordance with manufacturer’s specifications
vi. Contractor must provide a minimum two (2) year transferable labour warranty covering installation of the underlayment system
2. Install ¾” strapping at manufacturer recommended spacing and orientation for the standing seam system.
3.Install 2” drip edge around the entire perimeter.
4. Supply and install the new snap-lock standing seam roof system, including all accessory components:
i. Panels: 24” wide, minimum 24-gauge (0.7mm) gauge thickness.
ii. Finish: Hot-dipped zinc coated steel with factory applied colour finish.
iii. Attachment: Hidden clip system; all fasteners and components must be corrosion resistant.
5. Supply and install new roof vents, flashing and transitions to match the new roof colour.
6. Provide colour samples to the Site Authority for approval prior to fabrication.
7. Install appropriate sealants for a weather tight finish.
8. Supply and install snow guards at all roof edge areas to prevent snow and ice overhangs and uncontrolled shedding
i. Installation must include continuous coverage along the full perimeter of all roof sections, not limited to doors or designated walkways
ii. Snow guard layout and spacing must be designed to provide effective snow retention across all roof edges
iii. System must be compatible with the installed metal roofing system and designed to avoid damage to roof panels or fasteners
iv. Installation must be completed in accordance with accepted industry best practices for metal roofing systems and to maintain roof system integrity and performance
f) Compliance & Quality
1. All materials and installation must comply with the manufacturer’s specifications.
2. Provide written warranties for materials, finish, workmanship and service life.
g) Site Management
1. Protect surrounding property during work.
2. Maintain a clean worksite and secure materials to prevent wind damage.
3. Dispose of removed roofing material in accordance with environmental and local regulations.
4. The building will be occupied during installation, so the entrance must be protected against falling material. The emergency exits must remain usable throughout the project.

Selection criteria

Lowest Price

AI Summary

Roof replacements at Beaver Creek Institution for Correctional Service of Canada.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
cb-95-23116024
Solicitation no.
21443-27-5425701
Buyer
Correctional Service of Canada (CSC)
Notice type
Directed Contract
Method
Competitive - Open bidding
Procurement category
*CNST
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

UNSPSC
UNSPSC 72000000 — Building and Facility Construction and Maintenance Services

Delivery & regions

Province
Ontario
Regions of opportunity
*Gravenhurst
Regions of delivery
*Gravenhurst *Ontario (except NCR)
Contract term
September 1, 2026 → November 30, 2026

Key dates

Published
August 4, 2026
Closes
August 26, 2026
Amendment no.
007
Amendment date
August 20, 2026

Contact

Contact
E•••••••• L•••
Email
e••••••••@•••••••.••.ca
Phone
(613) •••-••••
Address
••• ••••• •••••• ••••, ••••••••, •••••••, ••• •••, ••••••
Sign up free to see the contact details

Award history

0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.

Upgrade to Pro

Documents

(1)
Complete source record(35)
Title
Roof Replacements – BC18 and BC24 – Beaver Creek Institution - Minimum
Reference number
cb-95-23116024
Amendment number
006
Solicitation number
21443-27-5425701
Publication date
2026-08-04
Tender closing date
2026-08-26T15:00:00
Amendment date
2026-08-20
Expected contract start date
2026-09-01
Expected contract end date
2026-11-30
Tender status
Open
Unspsc
*72101600 *72101601 *72152600
Unspsc description
*Roofing and siding and sheet metal work *Roofing installation or repair *Roofing and siding and sheet metal services
Procurement category
*CNST
Notice type
Directed Contract
Procurement method
Competitive - Open bidding
Selection criteria
Lowest Price
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Regions of opportunity
*Gravenhurst
Regions of delivery
*Gravenhurst *Ontario (except NCR)
Contracting entity name
Correctional Service of Canada (CSC)
Contracting entity address line
445 Union Street West
Contracting entity address city
Kingston
Contracting entity address province
Ontario
Contracting entity address postal code
K7L 2R8
Contracting entity address country
Canada
Contact info name
E•••••••• L•••
Contact info email
e••••••••@•••••••.••.ca
Contact info phone
(613) •••-••••
Contact info address line
••• ••••• •••••• ••••
Contact info city
••••••••
Contact info province
•••••••
Contact info postalcode
••• •••
Contact info country
••••••
Attachment
https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701--itt-amendment---modification-ias-02--final.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701--itt-amendment---modification-ias-01---final.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701--roof-replacement-x-2---construction-itt-solicitation_final.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701---roof-replacements---bc18-and-bc24---npp_final.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701--itt-amendment---modification-ias-03--final.pdf,https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/102500/5425701--itt-amendment---modification-ias-02-replace_final.pdf
Tender description
The Correctional Service Canada (CSC) requires a qualified contractor to complete the Roof Replacement for buildings BC18 (Unit 2) and BC24 (Unit 3) at Beaver Creek Institution. Objectives: CSC requires a qualified contractor to replace the existing aged asphalt shingle roof with a durable standing seam roofing system that enhances the structural integrity, improves weather resistance and reduces long term maintenance costs. Deliverables: a)The Contractor must ensure that all employees performing work at elevated heights have a valid Working from Heights certification. b)The Contractor must provide all required equipment, including their own equipment for working at heights to complete the work in the project. c)Measurement & Verification 1.Verify all roof dimensions and conditions prior to ordering materials and commencing work. d)Preparation 1.Inspect the roof deck and structure for damage, rot and deficiencies. Report any necessary repairs and provide a quote for additional work. 2. Remove existing vents. 3.Ensure the roof deck is clean and suitable for installation. e) Installation 1.Supply and install a full-coverage synthetic roof underlayment beneath the metal roofing system across all roof areas i. Underlayment must be premium grade, non-perforated synthetic material suitable for use under metal roofing systems ii. Minimum material weight of approximately 200 g/m² (or equivalent) iii. Underlayment must provide a continuous secondary water-shedding barrier over the entire roof deck iv. Material must meet or exceed industry standards for water resistance, tear strength, UV stability, and slip resistance v. Installation must be completed in strict accordance with manufacturer’s specifications vi. Contractor must provide a minimum two (2) year transferable labour warranty covering installation of the underlayment system 2. Install ¾” strapping at manufacturer recommended spacing and orientation for the standing seam system. 3.Install 2” drip edge around the entire perimeter. 4. Supply and install the new snap-lock standing seam roof system, including all accessory components: i. Panels: 24” wide, minimum 24-gauge (0.7mm) gauge thickness. ii. Finish: Hot-dipped zinc coated steel with factory applied colour finish. iii. Attachment: Hidden clip system; all fasteners and components must be corrosion resistant. 5. Supply and install new roof vents, flashing and transitions to match the new roof colour. 6. Provide colour samples to the Site Authority for approval prior to fabrication. 7. Install appropriate sealants for a weather tight finish. 8. Supply and install snow guards at all roof edge areas to prevent snow and ice overhangs and uncontrolled shedding i. Installation must include continuous coverage along the full perimeter of all roof sections, not limited to doors or designated walkways ii. Snow guard layout and spacing must be designed to provide effective snow retention across all roof edges iii. System must be compatible with the installed metal roofing system and designed to avoid damage to roof panels or fasteners iv. Installation must be completed in accordance with accepted industry best practices for metal roofing systems and to maintain roof system integrity and performance f) Compliance & Quality 1. All materials and installation must comply with the manufacturer’s specifications. 2. Provide written warranties for materials, finish, workmanship and service life. g) Site Management 1. Protect surrounding property during work. 2. Maintain a clean worksite and secure materials to prevent wind damage. 3. Dispose of removed roofing material in accordance with environmental and local regulations. 4. The building will be occupied during installation, so the entrance must be protected against falling material. The emergency exits must remain usable throughout the project.

Live tenders

Department of Public Works and Government Services (PSPC)1 day left

EW038-270870-ITQ-Storm Sewer Restoration, Northern Forestry Centre, Edmonton, AB

Construction
35 MATCHView →
Infrastructure1 day left

Infrastructure - Request for Proposal - EDMONTON - LEGISLATURE BUILDING Rotunda Renewal

35 MATCHView →
Department of Public Works and Government Services (PSPC)1 day left

Replacement of Motor Control Centres at the Radiation Protection Bureau

Construction
35 MATCHView →