Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowOpinion: Mark Carney’s climate ambitions still threaten Canada’s economy· Financial PostQ3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCA new chapter in Canada-India economic relations· Business Council of CanadaStaying in Canada is a 'huge relief' for Alberta business leaders· CBCTrump administration cancels some Canada tariffs amid close midterm races· NBC NewsWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCarney, Erdogan launch ‘strong and resilient’ Canada-Turkiye partnership· Al JazeeraJapan-Canada Chambers Council Joint Statement· Canadian Chamber of CommerceGlobal trade is changing how the Canadian economy works· Bank of CanadaEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsCanada’s services PMI shows sector shrinking for fourth straight month in September· The Globe and MailSoft economy should limit Bank of Canada's rate hikes: Capital Economics· BNN BloombergCanada’s inflation data, business survey on tap ahead of BoC decision· RBCPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial Post
← All tenders
Fisheries and Oceans Canada

Remplacement du quai de la station de recherche et sauvetage de Port Dover, y compris les poutres et le tablier au-dessus de l’eau

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
July 22, 2020
Published
June 17, 2020
Type
Construction
Explore similarBuilding and Facility Construction and Maintenance ServicesOntario

Full description

Replacement of Port Dover SAR dock Including Beams and Decking above Water
The condition of the Port Dover Dock east of the Coast Guard residence building is severely deteriorated. The dock has been barricaded since 2012 as it is considered structurally unsafe. The hollow core concrete slab is severely spalled and cracked through, and wood beams edging the dock are missing or falling off. There is concern regarding the dock becoming submerged and causing damage to search and rescue vessels.
A construction project is planned to replace the failed decking system according to the engineered design detailed in the drawings and specifications. All work is expected to take place above the water.
DELIVERABLES/SCOPE OF WORK
Work to be done under this Contract consists of the reconstruction and re-instating of usability of the dock East of the Port Dover SAR Station, located on the shoreline of Lake Erie with access from Passmore Avenue.
The work generally consists of the supply of small tools, heavy equipment, operators and labourers, and the supply of material to complete the site work tasks as detailed in the drawings and specification. Work tasks included, but are not limited to the following items:
1. Mobilization and demobilization
2. Remove pedestal
3. Remove tire bumpers and solar lights
4. Disconnect steel sheet piles and temp. support
5. Remove and dispose of wood materials
6. Remove and dispose of concrete materials
7. Construct concrete foundation wall
8. Supply and install 4 – W310x97 Steel Beams
9. Supply and install 6 – C200x28 Steel Channels
10. Supply and install 16 – C200x17 Steel Channels
11. Supply and install L152x100x9.5 Angle
12. Paint
13. Supply and install Steel Pan Decking
14. Supply and install Conc. Slab and Reinforcing
15. Supply and install Wood Bumpers
16. Reinstall tire bumpers and solar lights
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. The site can be observed from the public road and adjacent grassy area at Passmore Ave and Port Dover Harbour Marina. No access of any kind is permitted on the Dock, on the SAR station property, on the SAR station Wharf, or Floating Dock. Due to Covid 19 restrictions, the SAR Crew cannot be contacted. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Follow Provincial and Federal guidance for social distancing and enhanced hygiene practices.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
PW-20-00917820
Solicitation no.
F5211-200132
Buyer
Fisheries and Oceans Canada
Notice type
Request for Proposal
Method
Competitive - Open bidding
Procurement category
*CNST
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

GSIN
*5139A — *Construction Services, Not Elsewhere Specified
UNSPSC
UNSPSC 72000000 — Building and Facility Construction and Maintenance Services

Delivery & regions

Province
Ontario
Regions of delivery
*Ontario (except NCR)

Key dates

Published
June 17, 2020
Closes
July 22, 2020
Amendment no.
005

Contact

End-user
Fisheries and Oceans Canada
Sign up free to see the contact details

Award history

10 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.

Upgrade to Pro

Live tenders

City of Toronto2 days left

The City of Toronto’s Engineering & Construction Services division is bringing forward a Request for Tenders for Rehabilitation of Bridge ID147 Don Mills Road over Metrolinx and Bridge ID801 Tara Avenue over Metrolinx and TTC Busway as furt…

Construction
76 MATCHView →
City of Toronto2 days left

Request for Tenders (RFT) for Watermain Replacement and TTC Track Replacement on King Street West between Portland Street and Spadina Avenue. Please review all documentation pertaining to the tender in the SAP Ariba publication or register…

Construction
79 MATCHView →
Islands Trust (Islands Trust)2 days left

Islands Trust Accessibility Plan Development

Construction
81 MATCHView →