The main objective of this project is to repair the roof where problems have been identified by the consultant to enable the Mission to sustain operations.
The Contract comprises the removal of all existing roof coverings to the existing terrace at 4th Floor which includes concrete capping of varying thicknesses, the removal of existing insulation and existing mineral waterproofing finish. Then the provision of a new built-up felt roofing system with tapered falls insulation. Additionally, some investigative works to remedy leaks around windows to the external façade are to be undertaken.
The contactor will:
Provide all required permits equipment, tools, labour and materials needed for this project;
Remove existing paving and roof waterproofing;
Install a new Alumasc roof system over prepared substrate, including insulation laid to falls;
Replace rainwater drain outlets, to standard Alumasc details;
Replace all existing paving on pedestals, to match existing layouts; and
Work will be done as per specifications and drawings, meeting all applicable local building codes, regulations and prescribed standards indicated in the attached specifications.