Trade Agreement: NONE
Tendering Procedures: All interested suppliers may submit a bid
Competitive Procurement Strategy: Lowest/Lower Bid
Comprehensive Land Claim Agreement: No
Nature of Requirements:
F1700-195158
Sezginalp, Kipp (PWY)
Telephone No. - (604) 367-5341
Fax No. - (604) 775-6633
Email: k••••••••@•••••.••.ca
Title: Fulton Dam Valve House Access Stairs Refurbishment
Location:
Fulton Spawning Channel, Via Highway 118 between Topley and Granisle, B.C.
Note to Tenderers:
Drawings and Specifications are now available for viewing and downloading in a Portable Document Format (PDF) or in a standard paper version. Tenderers should note that Attachment contains the Drawings and Specifications Package (DSP) which consists of PDF files organized in an industry recognized directory structure.
Work Description:
The goal of this project is to improve site safety at the Fulton River Dam by replacing the existing stairway access to the dam regulating building (also called control room). The project scope includes the creation of a new stair system from the top of the bank to the top of the reservoir regulating building and includes the removal and disposal of the existing staircase structure.
The new stairs will be constructed mostly ?in-place? at the location of the existing stairway and will be made of steel and timber. The footings, base slabs and their connections to the rock base will be significantly upgraded. Several of the existing rock anchoring locations could be changed to better locations.
Safety will be paramount to the contractor planning, preparing and executing this work. The contractor will be considered as ?prime contractor? and be responsible for ensuring the highest safety standards are achieved during the work. This project will be separated into three (3) tasks:
Task 1 - Initial Site Visit with the Departmental Representative including contractor’s site and safety assessment as well as recommendations for rock anchoring locations
Task 2 -shop drawings preparation and approval by DFO prior to fabrication. Each sheet shall be sealed and signed by a Professional Engineer registered in the Province of British Columbia, who will be the Specialty Structural Engineer responsible for the integrity of his/her design.
Task 3 - Fabrication and Installation of Rock Fall Protection System
SITE VISIT:
There will be no site visit however pictures and drone pictures of the site are provided under Attachments.
Delivery Date:
The Contractor must perform and complete the Work by November 1, 2020.
Value of Project:
To assist with insurance requirements, this project is estimated to cost between $100,001 to $500,000
Enquiries:
Kipp Sezginalp, Supply Officer
Tel: (604) 367-5341
Fax: (604) 775-6633
Email: k••••••••@•••••.••.ca
Firms intending to submit tenders on this project should obtain tender (solicitation) documents through Buyandsell.gc.ca/tenders. Amendments, when issued, will be available from Buyandsell.gc.ca/tenders. Firms that elect to base their bids on tender (solicitation) documents obtained from other sources do so at their own risk and will be solely responsible to inform the tender calling authority of their intention to bid. In all cases, bidders must indicate (when requested) in the space provided on the tender form the identification number(s) of the amendment, if any, that they have taken into consideration for their bid.
This procurement office provides procurement services to the public in English.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.