The work consists of the furnishing of all plant, labour, equipment and material forbreakwater repairs at L’Anse Au Clair, NL, in strict accordance with specificationsand accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract consists of, but will not necessarily be limited to, the following:
.1 Demolition and removal of a section of the timber spraywall (some of which is connected to the wharf and some of which has collapsed and is lying on the ground near the site). All demolition debris to be disposed of at a Provincially approved waste disposal site.
.2 Temporary removal and reinstatement of the existing armour
stone to aid in the installation of the new spraywall vertical support
timbers
.3 Construction of a new section of timber spraywall, as noted on the drawings.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
10 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro