The objective for this work is to repair up to ten (10) damaged 20m Nephrops trawl nets after the annual trawl surveys (In the 2014, 2015 and 2016 seasons between July and October) to their original condition and fabricate up to a total of 85 trawl net parts (wing, belly, back and cod-end) for the survey in the following seasons (2015, 2016 and 2017).
This contract includes the option to extend the contract by up to two (2) additional one (1) year periods under the same terms and conditions.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.