Project Description
The site of work is the gravel approach and stone walls at the Silver Water Harbour in Silver Water, Manitoulin Island, Ontario. The harbour is located in Cooks Bay, North Channel, Lake Huron.
The work consists of, but not limited to, the following:
Demolition of existing east and west stone walls.
Salvaging and reinstating existing displaced stone adjacent to the approach.
Supply and installation of new core & armour stone to revet the slopes on either sides of the approach
Supply and installation of new granular material to construct new gravel approach and shoulder
Optional – Dredging of Areas “A” & “B”
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.