Trade Agreement: NAFTA/AIT/Canada FTAs with Peru/Colombia/Panama
Tendering Procedures: All interested suppliers may submit a bid
Attachment: None
Competitive Procurement Strategy: Best Overall Proposal
Comprehensive Land Claim Agreement: No
Nature of Requirements:
Suspended matter monitoring at sea using satellite imagery
(a) Requirement
PWGSC wishes to conduct a large-scale SM monitoring
demonstration project at sea using multispectral satellite
imagery during an actual dredging project. In 2015, Transport
Canada will undertake the sediment remediation directly south of
the Gaspé (Sandy Beach) commercial wharf by dredging. One of the
anticipated impacts of the restoration project is the
resuspension of sediments during the dredging operations and
their transport to marine aquaculture sites northwest of Gaspé
harbour.
As detailed in Annex A - Statement of Work, the Contractor must:
· perform calibration of multispectral bands from satellite
imagery in spring 2015 before the start of the work;
· develop and apply SM prediction model(s);
· monitor SM at sea while dredging work is done in the summer
and fall of 2015; and
· map the information and present the results in report form and
a Powerpoint presentation.
(b) Period of the Contract
The period of the Contract is from date of Contract to March 31,
2016 inclusive.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.