Title
To drill core wells in the Lower Grand River watershed, southern Ontario
Reference number
cb-11-57907639
Solicitation number
NRCan-5000094817
Publication date
2026-06-30
Tender closing date
2026-08-10T14:00:00
Expected contract start date
2026-09-14
Expected contract end date
2027-03-31
Unspsc
*71120000
*71121300
*72152800
Unspsc description
*Well drilling and construction services
*Downhole drilling tool services
*Water well drilling services
Notice type
Request for Proposal
Procurement method
Competitive - Open bidding
Selection criteria
Lowest Price
Trade agreements
*Canada-Colombia Free Trade Agreement
*Canada-Korea Free Trade Agreement (CKFTA)
*Canada-Peru Free Trade Agreement (CPFTA)
*Canada-Honduras Free Trade Agreement
*Canada-Panama Free Trade Agreement
*Canada-Chile Free Trade Agreement (CCFTA)
Regions of opportunity
*World
Regions of delivery
*Ottawa
Contracting entity name
Department of Natural Resources (NRCan)
Contracting entity address line
183 Longwood Road South
Contracting entity address city
Hamilton
Contracting entity address province
ON
Contracting entity address postal code
L8P 0A5
Contracting entity address country
Canada
Contact info name
Len Pizzi
Contact info email
len.pizzi@nrcan-rncan.gc.ca
Contact info phone
(343) 550-5308
Contact info address line
183 Longwood Road South
Contact info city
Hamilton
Contact info postalcode
L8P 0A5
Contact info country
Canada
Attachment
https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/99391/rfp-en-nrcan-5000094817.pdf
Tender description
The Geological Survey of Canada of the Geoscience and Earth Monitoring (GEMS) Sector of Natural Resources Canada (NRCan) is carrying out a hydrogeological characterization project in southern Ontario, in the lower part of the Grand River watershed (~2000 km2). Groundwater flow patterns and the occurrence of poor-quality water are complex across this region, which is affected by different natural and anthropogenic contaminants.
The exact number of boreholes and depths to be drilled as part of this contract will be determined in the field based on early results and budget considerations. It is anticipated that boreholes will be core drilled at four (4) sites, with the option of adding three (3) more, and then converted them into environmental monitoring wells. Depending on available budget, sites will comprise either 1) a PQ overburden cored hole and monitoring well screened at the interface between the surficial deposits and bedrock, and another nearby HQ rock cored monitoring well open in its bedrock section, or 2) a HQ rock cored monitoring well open in its bedrock section.
The total drilled depth of the wells completed into the bedrock would be approximately 50 m (165 feet), but if budget allows, two of them would be deeper (likely 65 m, i.e. 215 feet) deep. These wells will be used to assess composition and characteristics of the surficial sediment and bedrock units, as well as collect groundwater samples.
The drilling work would need to be begin third week of September 2026.