Town of Canmore is planning a multi-year utility replacement project within South Canmore. This phase of the project is to construct an infiltration dry pond to be used over the duration of the project to dewater the excavations during the utility replacement. The scope involves access road construction, tree removal, excavation, construction of the dry pond complete with geotextile and 40mm washed rock according to the drawings, including a perimeter berm and fencing.
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.