July 28/26 – Addendum #1 added, please see attached document for details.
This Invitation to Bid is to solicit and receive formal offers to construct four (4) flow monitoring stations along Pat’s Creek within the Town of Peace River, along with setup
and commissioning of the required SCADA and communication equipment. Two (2) of these locations will monitor water level via video camera and radar level sensor, and two (2) in-stream locations will perform flow & level monitoring.
This project will require site preparation, provision of materials, equipment & installation of four (4) monitoring sites installations as per design and specifications, obtaining work necessary work permits, traffic/pedestrian accommodation, and site restoration.
This opportunity will be evaluated by the Town and the consultant.
This Invitation to Bid is to solicit and receive formal offers to construct four (4) flow monitoring stations along Pat’s Creek within the Town of Peace River, along with setup an...
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.