The project scope includes supply and installation of AZ-12-700 Grade 400W Steel sheet piles along the airport shoreline as shown on the IFT drawings.
The scope also includes installing two CSP culverts (600mm and 900mm O.D.) along with required bedding, sheet pile wall penetrations and surface grading.
The successful contractor will supply labour, supervision, materials, tools, equipment and signage necessary to carry out project work as required.
The project scope includes supply and installation of AZ-12-700 Grade 400W Steel sheet piles along the airport shoreline as shown on the IFT drawings. The scope also includes ins...
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.