Tender available date: Friday, July 17, 2026.
Tender closing date: Thursday, August 20, 2026.
Pre-Tender Meeting: August 5, 2026 at 10:00 a.m. virtually over MS Teams. Attendees will need to join the meeting through the following link:
Click here to join the meeting
Meeting ID: 246 955 780 007 725
Passcode: wN3us69e
Project Inquiries: Bijhan Chaglani, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Bijhan.Chaglani@gov.ab.ca.
TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work:
TND0021637
Grading, Granular Base Course, Asphalt Concrete Pavement, Clearing, Install Storm Sewer, Street Light Installation and Other Work
HWY 11:10 Town of Rocky Mountain House to 1 Km E of Hwy 22
CENTRAL REGION
APPROXIMATE QUANTITIES:
485,860 Cubic Metre Common Excavation
53,440 Cubic Metre Borrow Excavation - Contractor Supplied
295 Metre Culverts - Supply and Install (600 mm dia. C.S.P.)
371 Metre Culverts - Supply and Install (800 mm dia. C.S.P.)
372,962 Square Metre Topsoil Placement
37.30 Hectar Drill Seeding
230 Cubic Metre Rock Check Dam
17,532 Square Metre Erosion Control Soil Covering - Supply and Install (Type A)
197,450 Square Metre Preparing Subgrade Surface (First Layer)
182,512 Tonne Granular Base Course Des. 2 Class 25
49,917 Tonne Asphalt Concrete Pavement – EPS Mix Type H1 (PG 58-34)
5,271 Tonne Asphalt Concrete Pavement – EPS Mix Type H1 (PG 70-28)
3,843 Metre Curb and Gutter (500 mm Semi-Mountable)
1,324 Square Metre Central Concrete Truck Apron
4,336 Square Metre Concrete Splitter Islands
2,301 Metre Trenching and Backfilling
Contractor to supply all materials.
Contract Completion Date: September 15, 2028.