The work involves the construction of a retaining wall and the installation of three (3)
Quatrex EMRS fuel storage units at 335 River Road in the City of Ottawa, Ontario.
Civil, Electrical and Structural disciplines will be involved.
It is proposed to install three (3) Quatrex ERMS fuel storage units on slab-on-grade
foundations. A retaining wall is to be constructed on the south side of the slabs to
accommodate the higher grade in the vicinity of the underground pump station and
reservoir.
Around the existing exterior fuel tank on the east side of the slabs, some existing jersey
barriers and bollards are to be removed and replace with new concrete filled steel
bollards as well as a new 300mm high concrete curb to contain potential fuel spills.
The surrounding parking lot area, which is currently gravel will be paved.
The General Contractor is responsible for the coordination and implementation of the
Commissioning of all Sub-Contractor work, equipment and installations. All
completed Electrical work is to be functionally and performance tested and verified by
the installing Trade Contractor, and written reports indicating sign-offs provided when
completed. A complete Commissioning Manual Summary report is to be prepared and
submitted along with the other close-out documents at the end of the project.