Tendarix.ca
BUSINESS NEWS
Deloitte Canada cuts GDP growth forecast by 20% as tariffs grip economy amid Trump's trade war· CBCDeloitte expects slowing pace of economic activity in Canada into 2027· Financial PostNew research finds electrifying Canada could add $3 trillion to the economy· Canadian Chamber of CommerceCanada’s economic Achilles’ heel is its regulations. The Building Canada Strong Act may change that· Business Council of CanadaDeloitte slashes 2027 economic outlook by 20% as trade tensions worsen· Global NewsGlobal trade is changing how the Canadian economy works· Bank of CanadaEconomic growth flattens in July as ‘broader volatility’ sets in· The Globe and MailEastern Canada business leaders call for 'single economy' between Atlantic provinces· CastanetPM Carney laughs off Trump adviser telling Canadian lobbyists to ‘get the hell out’ of U.S.· BNN BloombergEY Canada honours entrepreneurs driving the Canadian economy forward with 2026 Lifetime Achievement and Family Business Awards of Excellence· finance.yahoo.comEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· nanaimonewsnow.comCanada’s Productivity Push: Could Ottawa’s New Investment Strategy Accelerate Economic Growth and Business Spending?· kalkine.caHoles In Value Chains Are Holding Back Five Sectors That Have The Potential To Reshape Canada’s Economy For The Better· Canadian Chamber of CommerceEconomic returns from defence spending push will require removing barriers for industry: report· The Globe and MailAlberta CEOs join ‘stay’ camp as Calgary Chamber warns of separatism economic fallout· Global News
← All tenders
University of Alberta

University of Alberta - Request for Proposal - Arc Flash Studies Heating Plant, Central Cooling Plant and Cooling Plant on Campus

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
October 1, 2026
Published
September 15, 2026
Type
Request for Proposal (RFP)
Explore similarManagement and Business Professionals and Administrative ServicesAlberta

Full description

The University of Alberta is inviting Proposals from experienced Industrial and Utility Engineering Consultants for the preparation of Arc Flash Studies for the Heating Plant, Central Cooling Plant, and the Cooling Plant on Campus. Each plant is connected to the University owned and maintained University of Alberta North Campus 14.4 kV electrical distribution system. These installations comprise equipment operating at 14.4 kV, 4.16 kV, 600 V, 208 V, 120 V and some battery banks higher than 150 VDC. Proponents are advised that responses to this Request for Proposal must be submitted electronically through the public portal website in accordance with the Instructions to Proponents section.

AI Summary

The University of Alberta is inviting Proposals from experienced Industrial and Utility Engineering Consultants for the preparation of Arc Flash Studies for the Heating Plant, Cent...

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
RFP 2026-0132
Buyer
University of Alberta
Method
RFP
Estimated value
Not disclosed
Source
alberta

Classification & terms

UNSPSC
UNSPSC 80000000 — Management and Business Professionals and Administrative Services

Delivery & regions

Province
Alberta

Key dates

Published
September 15, 2026
Closes
October 1, 2026

Live tenders

Department of Public Works and Government Services (PSPC)2 days left

W3555-26S030 - Modular Office Building Rental

Goods
79 MATCHView →
Department of Public Works and Government Services (PSPC)2 days left

Military Pay Managed Services

Services
81 MATCHView →
Department of Public Works and Government Services (PSPC)2 days left

RFP - W6369-25X034 DND Stocktaking and Inventory Services

Services
80 MATCHView →