The scope of work for all site locations includes, but is not limited to, the following:
- Mobilization
- Site Isolation and Water Accommodation (those with in-stream work only)
- Fish Capture and Release (those with in-stream work only)
- Total Suspended Solids (TSS) Testing (those with in-stream work only)
- Traffic Accommodation
- Site Grading and Remediation, including:
o All disturbed areas returned back to existing condition or better
o Seeding
o Erosion and Sediment Control (Matting and Fibre Rolls)
o Topsoil
- Replacement or Re-Installation of Guardrail and Bridgerail Hardware;
- Partial Depth Repairs;
- Recasting Pier Plinth and Pier Access
- Application of Gravity Fed Epoxy;
- Void Filling with Low Strength Grout;
- Installation of Concrete Floor in Culvert Barrel;
- Removal of Abandoned Timber Piles and Misc. Timber Pieces;
- Replacement of Timber Pile Tin Caps;
- Replacement of CCA Strip Deck Planks; and,
- Headslope Repair