Title
Erosion protection work at the Chilliwack Hatchery, British Columbia for Fisheries and Oceans Canada (DFO)
Reference number
cb-367-75841136
Solicitation number
30008466
Publication date
2026-09-11
Tender closing date
2026-09-21T15:00:00
Expected contract start date
2026-09-28
Expected contract end date
2026-10-19
Unspsc description
*Marine construction services
Procurement category
*CNST
Notice type
Request for Proposal
Procurement method
Competitive - Open bidding
Selection criteria
Lowest Price
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Regions of opportunity
*British Columbia
Regions of delivery
*British Columbia
*Canada
*Chilliwack
Contracting entity name
Department of Fisheries and Oceans (DFO)
Contracting entity address line
200 Kent Street
Contracting entity address city
Ottaw
Contracting entity address province
ONTARIO
Contracting entity address postal code
K1A 0E6
Contracting entity address country
Canada
Contact info name
S••••• H•••••••
Contact info email
s••••••••@•••••••.••.ca
Contact info phone
(343) •••-••••
Contact info address line
••• •••• ••••••
Contact info postalcode
••• •••
Contact info country
••••••
Attachment
https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/106498/30008466---itt---en.pdf
Tender description
Erosion protection work at the Chilliwack Hatchery, British Columbia for Fisheries and Oceans Canada (DFO)
The work will be conducted at Chilliwack River Hatchery, 55205 Chilliwack Lake Road Chilliwack, BC V4Z 1A7
Riverbank Stabilization and Log Jam removal.
Fisheries and Oceans (DFO) requires urgent erosion protection works at the Chilliwack River Hatchery intake area to protect critical infrastructure, including the intake access road, intake pipeline, intake pond, and associated hatchery facilities.
Recent riverbank erosion has resulted in significant loss of bank protection within the identified upstream and downstream repair areas. Continued erosion during future high-flow events may result in damage to the access road, exposure of the intake pipeline, and potential failure of the downstream road embankment.
The Contractor must provide all labour, equipment, materials, and incidentals necessary to complete the work.