This project will install three backflow to the building 1,3,4,5,6,7,8,9,10 and main entrance in the institution Drummond. Based on the given drawings and specifications, the contractor shall make the required modifications (ex: piping modifications, furnishing, installing and verifying of back-flow preventor, etc…) in accordance with CSA standard B64 and NFPA13.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.