The Scope of Work for this Contract is to remove, salvage, and reinstall the existing single span (1 – 11.6m) type HC precast concrete girders. Remove and dispose existing timber piles and to supply, set up and drive galvanized and plain steel H piles at abutments, SPCS abutments backwalls and wingwalls including new steel H-piles abutment caps with stiffener plates, Class 1 heavy rock riprap, backfill at bridge ends, installation of existing W- beam bridgerail and approach rail transition, approach road guardrail, roadway work, and supply and installation of silt fence.